How to apply for Con Edison gas service?

How to apply for Con Edison gas service?

Applicant gas service and meter installation arrangements are subject to Con Edison’s review and approval. Applicants should submit a Work Request as soon in the planning process aspossible. DISCLAIMER: This is a guidance document for the convenience of the public. It does not substitute for

How many miles of natural gas pipeline does Con Edison have?

Call before you dig! Much of the Con Edison equipment that transmits and delivers energy is under the ground, including more than 4,300 miles of natural gas pipelines. We work diligently to keep our systems safe and our excellent safety record demonstrates that commitment. New York State law requires anyone planning

What are the state requirements for Con Edison?

Con Edison does not assume the obligation of enforcing State, City and Local Municipal code requirements. 3 Page intentionally left blank. Reserved for future use 4 A Customer Guide to Natural Gas Service Installation Accidents involving dig-ins to under- ground facilities occur every year. They can damage equipment,

How to contact Con Edison for gas service?

Should you have any questions regarding this guide, please contact your local Con Edison Customer Service Representative. Applicant gas service and meter installation arrangements are subject to Con Edison’s review and approval. Applicants should submit a Work Request as soon in the planning process aspossible.

How long has Con Edison been in business?

The Con Edison System For more than 180 years, Con Edison has served the world’s most dynamic and demanding marketplace – metropolitan New York while maintaining a safe and reliable natural gas supply to more than 1.1 million gas customers.

Where does gas piping need to be installed in a building?

Underground piping installed through the outer foundation or basement wall of a building shall be encased in a protective sleeve or protected by an approved device or method. The space between the gas piping and the sleeve and between the sleeve and the wall shall be sealed to prevent entry of gas and water. [NFPA 54:7.1.5]

How big does a gas conduit need to be outside a building?

The conduit shall extend at least 4 inches ( 102 mm) outside the building, be vented outdoors above finished ground level, and be installed to prevent the entrance of water and insects. [NFPA 54:7.1.6.1]